Irrigation & drainage located in Ahwaz
-
Construction of 120 No. of hydraulic
structures (Pump-station, Siphon, CAV, Check, DPS, CIPS, SDPS, Bridge,
Culvert, DB, CR, TO, …)
-
Construction of 600 km service road paved
with gravel
|
-
Excavation and lining of 35 km irrigation
canals (Q=35000 lit/sec)
-
Construction
of 51km drain canal (Q=12000 lit/sec)
-
Leveling
about 12,000,000 m2 with tolerances of
±3
cm
-
Laying
of 145 km pipe drain collectors (ID300~1000 mm, Depth=5m)
-
Excavation
and installation of 2400 km lateral PVC drain (ID=160, 200mm, Depth =
2.5m)
-
Earthworks
in totally 13,000,000 m3
-
Total concrete used as amount of 109000 m3
-
Construction
of 35 units of pump stations
-
Construction
35 km dick with earth filling
-
Construction and installation of 500
numbers of prefabricated manhole
-
Construction
and installation of several control rooms as hydraulic structures
-
Transportation
of 169,000,000 m3/km of gravel and earthwork’s movement have
been done
|