|
Road & Bridge |
Lausanne Company since 1954 |
||
|
|
Road and Bridge
Hot mixed bituminous surface as high way Kahkom Miangangal (between Shieraz to Bandar Abbas) with length 28 km constructed in high sloppy area includes three tunnels in totally 1,35 km length and large bridges & small as follows: 4 spans 33/00 ml and 65 m. height also 200 unit as other small bridges.
|
|
|