Project for Example:

Transferring water

to Tabriz from Zarineh Rood

 

Summery of the major works:

  • Operation a factory for production 140km presstresed concrete pipes with diameter of  2000mm

  • Installing factory for blasting, coating and mortared lining for steel pipes

  • Transferring  water with 180 km length and 2000 mm diameter pipes

  • Laying concrete pipes and steels pipes

  • Filling around the pipes and construction the road with amount of  7,000,000 m3

  • Excavation in earth and stone with amount of 12,000,000 m3

  • Using 200,000 m3 concrete for  necessary structures along the line

  • Connection pipe line to 12 reservoirs, water treatment and 5 pump stations

  • 180 km gravel road with all necessary culvert and bridges along the pipe line.

  • For avoiding any barred traffic  jacking system applied in executing the pipe line under the roads and rail roads

  • This project executed under cooperation with two other companies, under leader shipping of Lausanne and 40% share

 

 

 