Operation a factory for production 140km
presstresed concrete pipes with diameter of 2000mm
-
Installing factory for blasting, coating
and mortared lining for steel pipes
-
Transferring
water with
180 km length and 2000 mm diameter pipes
-
Laying concrete pipes and steels pipes
-
Filling around the pipes and construction
the road with amount of 7,000,000 m3
-
Excavation in earth and stone with amount
of 12,000,000 m3
-
Using 200,000 m3 concrete for necessary
structures along the line
-
Connection pipe line to 12 reservoirs,
water treatment and 5 pump stations
-
180 km gravel road with all necessary
culvert and bridges along the pipe line.
-
For avoiding any barred traffic jacking
system applied in executing the pipe line under the roads and rail roads
-
This project
executed under cooperation with two other companies, under leader shipping
of Lausanne and 40% share